20MVA Power Transformers Shipped for Utility Substation Upgrade

Two oil-immersed power transformers completed factory acceptance testing and were packed for overseas utility delivery, supporting a regional grid reinforcement project.

Utility buyers require not only electrical performance, but complete documentation, packing integrity and predictable lead times. CASDE manufactured and tested 20MVA-class oil-immersed transformers to the project specification, with routine tests and packing designed for long ocean freight.

Delivery Highlights

  • Capacity class: 20 MVA oil-immersed power transformers
  • Factory routine tests completed before shipment
  • Export packing with moisture and impact protection
  • Technical documents package for site installation teams

Why It Matters for Buyers

For EPC and utility procurement, a clean FAT and packing record reduces risk at destination. Clear voltage, vector group and cooling options were locked early to avoid redesign delays.